2023-01 | 2023-01 DIP Lot 40 Appraisal RFP |
2022-04 | 2022-04 DIP Well #2 Disinfection & Improvements RFQ |
2022-04 | 2022-04 DIP Well #2 Disinfection & Improvements Plans |
2022-04 | 2022-04 DIP Well #2 Disinfection & Improvements Addendum 1 |
2022-04 | 2022-04 DIP Well #2 Disinfection & Improvements Addendum 1 Drawings |
2022-03 | 2022-03 BPT Lot 9 Leveling RFQ |
2022-03 | 2022-03 BPT Lot 9 Leveling Project Plans |
2022-02 | 2022-02 BPT Irrigation-Drainage-Fill Addendum 1 |
2022-02 | 2022-02 BPT Irrigation-Drainage-Fill RFQ |
2022-02 | 2022-02 BPT Irrigation-Drainage-Fill Project Plans |
2021-06 | 2021-06 DIP Feasibility Study Addendum 1 |
2021-06 | 2021-06 Dallesport Industrial Park Feasibility Study RFQ |
2021-05 | 2021-05 Boat Ramp Repair RFQ |
2021-05 | 2021-05 Boat Ramp Repair Drawing |
2021-04 | 2021-04 BPBP Marina Parking Improvement RFQ |
2021-04 | 2021-04 BPBP Marina Parking Improvement Drawing |
2021-03 | 2021-03 BPBP Lot 9 Leveling RFQ |
2021-01 | 2021-01 Groundskeeping RFQ |
2020-02 | 2020-02 DIP 151C PRICING SHEET |
2020-02 | 2020-02 DIP 151C GC QUESTIONS |
2020-02 | 2020-02 DIP 151C BUILDING ADDENDUM |
2020-02 | 2020-02 DIP 151C BUILDING PLAN SET |
2020-02 | 2020-02 DIP 151C BUILDING BID-PT2 |
2020-02 | 2020-02 DIP 151C BUILDING BID-PT1 |
2018-04 | DIP Lot 40 Real Estate Appraisal |
2018-03 | Marina Way Radar Inspection |
2018-02 | Real Estate Appraisal Services |
2018-01 | Groundskeeping Services |
2017-05 | Suite A Carpet Cleaning |
2017-04 | Suite E HVAC Repair |
2017-03 | DIP Well Controller Diagnosis |
2017-02 | Backflow Prevention Device Testing |
2017-01 | Marina Way Path Plan Set
|
2016-03 | Bingen Point Grading Project |
2016-02 | 118 Columbia River Bldg Asphalt Repair |
2016-01 | DIP Mine Archaeology Survey Addendum 1 |
2015-06 | RAMCo Site Cap Plan Set Addendum 1 |
2015-05 | 1D Electrical Cabinet Reinstallation |
2015-04 | BPBP Archaeological Survey |
2015-03 | 1D Electric Cabinet Pad Replacement (Cancelled and withdrawn) |
2015-02 | Concrete Procurement |
2015-01 | Groundskeeping Services |
2014-06 | DIP Lot 80 Water Well Plan Set
|
2014-05 | DIP Lot 80 Grading Plan Set Addendum 1 |
2014-04 | Bingen Point Flooring Addendum 1 |
2014-03 | DIP Lot 5 Fire Line Removal |
2014-02 | DIP Lot 53 Archaeological Survey Addendum 1 |
2013-10 | Marina Way Overlay Plan Set Addendum 1 Addendum 2 |
2013-07 | Groundskeeping Services Addendum 1 |